Phase 1 & 2 COMPLETE: VV Power
- After the initial Jan 2022 trial, VoltVision finished the digitisation of all six of Endeavour’s West African mines in December 2022
- All sites are monitoring power consumption, quality and efficiency
- Group monitoring, auditing and reporting of Scope 1 and 2 emissions data
- Asset management and fault prediction on larger motors
- Early operational improvements identified and changes made at two sites
Initial Savings
- 8% static power reductions associated with OPEX at single site
- 20% energy reduction for the crushing process
- 60% improvement in power outage recovery time at single site
- Significant CAPEX savings
- Improved protection programming allowing for upgrades and increase in protection equipment effectiveness
- Large reduction in annual CO2 emissions at single site